

Projects (as Main Contractor)
Residential Building, No. 4 Kent Road, Kowloon Tong
Composite Development at No.245-247,Tai Kok
Commercial Building, 40 Kimberley Road, Tsim Sha Tsui
Residential Building Works, 11 Sha Tin Ridge Road, Sha Tin
Seng Tak Central School Building Project, New Clear Water Road, Kowloon
Commercial Development 24A &24B Granville Road, Tsim Sha Tsui
No.8-12, Yuen Long Pau Cheung Square, Yuen Long
Composite Building On K.I.L 11238 At Nos 445-447 Shangshui street, Kowloon
E&M Works Construction:
Sha Tin Fo
Redecoration Work
Kau To Shan and Hong Lok
和(hé)明以主承建商(shāng)的身份完成了:
2.香港觀塘新(xīn)清水灣(wān)道(dào)重置香港扶幼會盛德中心學(xué)校建(jiàn)築(zhù)工程(整單所有項目)
5.九肚山以及康(kāng)樂園南灣、壽臣山、加列(liè)山等豪宅裝修等
6.大角咀道245-247號住宅大樓建築工程(整單所有項(xiàng)目)
8.九龍塘窩打老道(dào)147
9.尖沙咀加連威老(lǎo)道24A&24B大廈
10.元朗炮仗坊
11.旺角上(shàng)海街445號住宅(zhái)大
12. 屯門環保園廢紙回(huí)收廠房及其他(tā)相關的發展(zhǎn)項目之
Projects (as Sub Contractor)
Civil Engineering:
Hong Kong's Siu Sai Wan Park Drainage Project,
Government Development Department's Tin Shui Wai Wooden Bridge Project,
Tung Chung Road Extension Project, and other steel structures, pavements, channel works, concrete structures and drainage works.
Hong Kong Siu Sai Wan Park Steel Structure Project, Stainless Steel Project,
Phase III Reclamation 2009/19 project of the steel railing project, airport railway depot steel structure.
A&A Works Construction:
Steel Structure Engineering
Shanghai Lu Pu Bridge Steel Structure Engineering.
Design and manufacture of installation works:
Mobile safety fence in the Wan Chai - Central Phase II reclamation works.
Other projects completed by the Company include:
Shatin Vista Paradiso external area ; site wooden & steel decoration work
土性野战视频,亚卅性 视频,xyx性爽欧美视频,性添视频程
其他(tā)工程
沙田聽(tīng)濤雅(yǎ)苑外欄(lán)&裝飾工程(木器、鐵器)